90-day total
130
Mesa, AZ · Solar
130 solar permits were issued between Aug 22, 2026 and Nov 19, 2026 — about 1.43 per calendar day, on 52 days that had at least one. Down 19% in the last 30 days (34 permits) versus the 30 days before that (42).
7-day free trial, then monthly. 30-day lead guarantee. Checkout links are Stripe test-mode placeholders until billing is connected.
90-day total
130
Last 30 days
34
Down 19% in the last 30 days (34 permits) versus the 30 days before that (42).
Peak day
9
Sep 10, 2026
Counts are issued permits in seven-day buckets from the start of the 90-day window. Partial final weeks are expected.
Street address, work description, issue date, and published valuation only. No homeowner names, phones, or emails.
| Date | Address | Description | Valuation |
|---|---|---|---|
| Nov 19, 2026 | 5104 E DECATUR ST | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $13,000 |
| Nov 19, 2026 | 3211 N SAFFRON | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $14,239 |
| Nov 18, 2026 | 3762 E DRAGOON AVE | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $10,000 |
| Nov 17, 2026 | 7355 E POSADA AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $13,000 |
| Nov 17, 2026 | 9853 E TEXAS AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $13,000 |
| Nov 17, 2026 | 1733 S GREENFIELD RD | Install PV system on fuel canopy at existing gas station. PV system exempt from permit, Mesa admin code 4-1-4(B)(2)(r). Building permit for electrical conduit trenching and recertification of SES listing. New electrical equipment shall be painted to match existing building. Results in CofC. | $270,000 |
| Nov 17, 2026 | 9229 E UNIVERSITY DR | Install PV system on fuel canopy at existing gas station. PV system exempt from permit, Mesa admin code 4-1-4(B)(2)(r). Building permit for electrical conduit trenching and recertification of SES listing. Approved as noted. Results in CofC. | $270,000 |
| Nov 13, 2026 | 1854 E DOWNING ST | PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $14,850 |
| Nov 13, 2026 | 5766 E ENROSE ST | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $10,000 |
| Nov 12, 2026 | 5055 E HILTON AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $13,000 |
| Nov 12, 2026 | 3454 E INGLEWOOD CIR | PERMIT IS ONLY FOR INSTALLATION OF TWO ENPHASE 10C BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $16,000 |
| Nov 12, 2026 | 7359 E FLOWER AVE | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $12,000 |
| Nov 10, 2026 | 1454 N SETON | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $13,000 |
| Nov 10, 2026 | 7926 E DES MOINES ST | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $13,000 |
| Nov 10, 2026 | 1060 W UNIVERSITY DR | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $22,000 |
| Nov 10, 2026 | 930 E 10TH ST | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $29,700 |
| Nov 6, 2026 | 8128 E RENATA AVE | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $9,000 |
| Nov 5, 2026 | 447 S WILDROSE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $1,000 |
| Nov 5, 2026 | 10441 E UNITY AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $25,200 |
| Nov 5, 2026 | 3750 E IRWIN AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY INSIDE GARAGE. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. | $13,000 |
Business names as published by the city. Personal names are withheld. Valuation is a sum of the city’s figures and is often incomplete.
| Rank | Contractor | Permits | Published valuation |
|---|---|---|---|
| 1 | ONEWORLDENERGY LLC DBA : OUR WORLD ENERGY | 7 | $101,700 |
| 2 | Facility Innovations Group | 2 | $540,000 |
| 3 | SOLAR TRIPP LLC | 1 | $28,577 |